⚠ This is a sample demo portal — all data shown is fictional · Powered by Aesthetic E Consulting
Aesthetic E Consulting · Sample Portal
Skyline
Build Co.
Hub
SBC
Your live project dashboard. Track progress, blockers, and site activity — updated in real time.
3
Active Projects
47
Units Tracked
12
Site Visits MTD
2
Critical Blockers
Active Projects
1200 Park Ave — Residential Units (Floors 3–8)
Skyline Build Co.
Active
1200 Park Ave — BOH & Common Areas
Skyline Build Co.
Active
88 Meridian St — Penthouse Fit-Out
Skyline Build Co.
On Hold
Phase Progress — 1200 Park Ave Residential
Floor / Unit Phase 1 · Rough-In Phase 2 · Service Phase 3 · Trim Phase 4 · Closeout
3rd Floor — Unit 3ADoneDoneIn Progress
3rd Floor — Unit 3BDoneDoneStuck
3rd Floor — Unit 3CDoneIn Progress
4th Floor — Unit 4ADoneReady
4th Floor — Unit 4BIn Progress
5th Floor — Unit 5AStuck
Critical Blockers
🚨
Unit 3B — Trim Phase Stuck
GC has not completed drywall in bathroom. Electrical trim cannot proceed until walls are closed. Waiting on GC foreman confirmation of completion date.
Logged: May 2, 2026 · Responsible: GC
🚨
Unit 5A — Rough-In Stuck
Panel location change requested by architect. Awaiting revised drawings before conduit rough-in can continue. RFI submitted.
Logged: May 1, 2026 · Responsible: Architect
Recent Site Visits
SVR-260502-1200ParkAve — 3 issues logged, materials ordered
May 2, 2026
SVR-260429-1200ParkAve — GC coordination, no blockers
Apr 29, 2026
SVR-260425-1200ParkAve — Phase 2 progress, 2 units completed
Apr 25, 2026