01 — General Lighting & Receptacles
02 — Fastened-in-Place Appliances
03 — Heating & Air Conditioning
04 — EV Charger (EVSE)
```
```
✓ EMS Exception Applied — per NEC 625.42 / 750.30, an approved Energy Management System that automatically curtails EV charging load may qualify for a demand reduction. Confirm with AHJ before applying. Full nameplate still shown in calculation for reference.
Minimum Service Size — Calculation Breakdown
```
General Load (Lines 1–4):
0 VA
After Demand Factor — 100% of first 10,000 VA + 40% of remainder:
0 VA
Largest HVAC Load (smaller omitted per NEC 220.82(C)):
0 VA
Total Demand Load:
0 VA
0 A
Minimum Service Size · Total VA ÷ 240V
Conductor Sizing
Service / Feeder Conductor
—
Enter load data to calculate
Section 310.12 (formerly Table 310.15(B)(7)) · Single-Phase Dwelling
Neutral Conductor
—
Enter load data to calculate
NEC 220.61 · Min floor per Table 250.102(C)(1)
Grounding Electrode Conductor
—
Enter load data to calculate
Table 250.66 · Based on service conductor size