Field Tools
Field
Site Visit Report
Log issues, material needs, GC blockers, and follow-ups after every site visit.
โ
Coming Soon
Weekly Status Summary
Auto-generate a weekly project summary based on site visit logs.
Coming Soon
GC Communication Log
Document every GC conversation with date, topic, and outcome.
Field ยท NEC 220.82
Single Family Dwellign
Load Calculator
*optional method*
Load Calculator
*optional method*
Optional Method โ Single Family Dwelling. Calculates minimum service size, conductor sizing, and 2023 NEC EV charger rules per Article 220.57.
โ
Field ยท NEC 310.16
Equipment Conductor
Sizer
Sizer
Calculate feeder, neutral, and EGC sizes from MCA/FLA. Scan nameplates with AI or enter manually. NEC Table 310.16 and Table 250.122.
โ
SOPs
SOP ยท Master
sop โ multi-unit residential board
Step-by-step Monday.com instructions for foremen. Fill in project details and share before any new project starts.
โ
Coming Soon
Foreman Guide โ Commercial
Monday.com guide tailored for commercial board structure and workflows.
Checklists
Checklist ยท Master
New Project Onboarding
29-item checklist covering Drive setup, Monday board, people access, field readiness, and billing.
โ
Coming Soon
Project Closeout Checklist
Everything needed to formally close a project โ inspections, billing, documentation, and archiving.